Design and Construction Supervision of Electrical and Mechanical Engineering Services for Njombe Tea Factory in Tanzania for Unilever Tea (T) Ltd. The project comprised of the production building, withering building, boiler house, office block, service bay, fire station, ablution block, gate house, etc,.
Total Project Cost excluding machinery – TZS 13,115,044,504.00.
The Project is at the design stage.
