The project comprises supply, installation and commissioning of 1MVA turbine driven generator, 1 x 1MVA, 433V/11kV step-up, 1 x 1MVA, 11kV/433V step-down and 1 x 30kVA, 11kV/433V step-downsubstations including HV and LV switchgear and cables, 2.3km, 11kV overhead power line and synchronization with Kenya power supply including import/export metering at Mataara Tea Factory in Kiambu County for Kenya Tea Development Agency Ltd.
Total Project Cost – USD 1,559,478.00.
The Project is ongoing.