Runji Consulting Group

Consultancy Services for Supervision of Rehabilitation and Upgrading of Upperhill Roads. -Bunyala Railway Bridge

Name of Client: Kenya Urban Roads Authority

Narrative description of Project: The main objective of the assignment is to,  Rehabilitation and Upgrading the roads consisting of removal of the existing 2-lanes bituminous sections and widening of the same 2-lanes to a 2-way carriageway with median separator, cycle tracks, footpaths, drain and street lighting.

Description of actual services provided by your staff within the assignment: Construction supervision to the designed standards.

Country: Kenya                     Location within country:  Nairobi City of Kenya

Start date (month/year):  May 2012             Completion date (month/year):  January 2018

You’d like to talk to us? We are available
Get in touch with us