Name of Client: NIB- National Irrigation Board
Narrative Description of Project: The project involves design of a concrete faced rock-fill dam (CFRD) at the Existing Gogo Dam site. The objective of the project is to harness, conserve, and control and utilize waters of Kuja River for the socioeconomic development of the semi-arid Lower Kuja area. The dam is intended to provide flood controls, irrigation development and hydropower generation. The project also entailed the design, drilling and installation of water supply boreholes
Description of Actual Services Provided by Your Staff: Preparation of Feasibility Studies, Detailed
Engineering Designs, Drawings and Engineer’s Estimate and Preparation of Bid Documents. Supervision of Construction works Design of water supply boreholes
Country: Kenya Location within Country: Migori County, Nyanza Province
Start Date: May 2013 Completion Date: January 2017